The second stabilisation trial of black soils was completed in Narrabri in November 2018. These trials follow the initial trial carried out in Goondiwindi in late 2016. Attached is the investigation and construction report for the Narrabri trials. Further reports will follow which will cover the ongoing performance of these trials.Click here to view the report.